Descrierea proiectului

Complete building engineering design in the technological and comfort areas. Design of new development building, including the design of mechanical engineering supply systems for the technological systems.

Detalii

Obiectul contractului:

Complete building engineering
Locație:
Kecskemét, Hungary
An:
2013

Caracteristici

Complete building engineering: comfort ventilation and extraction systems, heating/cooling, water supply and sewerage, gas supply, compressed air system, heat recovery system.

Imagini ale proiectului

Alte proiecte

Locație: Debrecen, Hungary
An: 2016
Following the creation of the detailed designs of Phase I, we designed the complete building engineering systems of Phase II of the factory of FAG.
Locație: Various locations
An: 2009-2024
Design of on-site utility and road networks for industrial facilities, residential developments, commercial buildings, and public infrastructure projects.
Locație: Szolnok, Hungary
An: 2014
Recommissioning three existing wells and the design and construction of the new water treatment facility.

All rights reserved © 2026 Koros Consult & Engineering SRL