Project Description

Following the creation of the detailed designs of Phase I we designed the complete building engineering systems of Phase II of the factory of FAG in Debrecen, Hungary. In addition to the mechanical engineering supply systems for the technology our task included designing the technological pipe grids and industrial gas grids.

Due to the technology, which involves oil, we had to pay particular attention to the air quality of the factory hall and ensuring that air handling units can operate in such an environment. Accordingly, special air handling units had to be designed.

Details

Subject of the Contract

Detailed design of the complete building technology

Location:

Debrecen, Hungary

Year:

2016

Features

Detailed design of the complete building technology:
low- and medium-voltage systems, weak-current systems, building engineering, mechanical engineering automation, technological systems

Pictures about the Project

More Projects

Location: Budapest, Hungary
Year: 2016-2021
ETELE Plaza is the newest shopping center in Újbuda. The design of the building began in 2016, construction started in 2018, and it has been in operation since autumn 2021.
Location: Pécs, Hungary
Year: 2010
Concert hall whose design makes it also suitable for conferences and balls.
Location: Budapest, Hungary
Year: 2016
Building engineering design, design of the automatic fire suppression system.

© All rights reserved 2025 Körös-Consult Zrt.