Project Description

Complete building engineering design in the technological and comfort areas. Design of new development building, including the design of mechanical engineering supply systems for the technological systems.

Details

Subject of the Contract

Complete building engineering

Location:

Kecskemét, Hungary

Year:

2013

Features

Complete building engineering: comfort ventilation and extraction systems, heating/cooling, water supply and sewerage, gas supply, compressed air system, heat recovery system.

Pictures about the Project

More Projects

Location: Various locations
Year: 2009-2024
Design of on-site utility and road networks for industrial facilities, residential developments, commercial buildings, and public infrastructure projects.
Location: Debrecen, Hungary
Year: 2016
Following the creation of the detailed designs of Phase I, we designed the complete building engineering systems of Phase II of the factory of FAG.
Location: Miskolc, Hungary
Year: 2014-2015
The airbag manufacturer Takata-Petri built its new factory in Miskolc, and our company was responsible for the design of the entire building technology during the tender phase.

© All rights reserved 2026 Körös-Consult Zrt.