Project Description

Our company participated in the building permit process for the Werk1 TGA (MEP) systems and the localization of the construction documents, acting as the Hungarian partner of a German design firm. On behalf of Kraftszer, we prepared the installation drawings for the WERK1 energy center, and as part of the contract, we are providing site engineering services.

In addition, we prepared installation and as-built drawings for several other buildings. During the Werk2 expansion, we developed the detailed construction plans for the new *Rohbau* building on behalf of ATP/MBT, and we also prepared the installation and as-built drawings for this building for KÉSZ Zrt.

Details

Subject of the Contract

HVAC systems design

Location:

Kecskemét, Hungary

Year:

2009-2024

Features

Our colleagues’ advanced German language skills facilitated effective collaboration with the client (project engineer, construction manager). We are equipped with specialized design software that complies with Mercedes’ relevant standards (MicroStation).

Pictures about the Project

More Projects

Location: Budapest, Hungary
Year: 2016
Building engineering design, design of the automatic fire suppression system.
Location: Uppsala, Sweden
Year: 2006
3D design of pharmaceutical technology plant, using the MicroStation TriForma and Bentley Plant Space Design Series software
Location: Various locations
Year: 2009-
Design and implementation of complex water treatment and building services engineering projects for industrial and drinking water applications.

© All rights reserved 2026 Körös-Consult Zrt.