Project Description

Our company participated in the building permit process for the Werk1 TGA (MEP) systems and the localization of the construction documents, acting as the Hungarian partner of a German design firm. On behalf of Kraftszer, we prepared the installation drawings for the WERK1 energy center, and as part of the contract, we are providing site engineering services.

In addition, we prepared installation and as-built drawings for several other buildings. During the Werk2 expansion, we developed the detailed construction plans for the new *Rohbau* building on behalf of ATP/MBT, and we also prepared the installation and as-built drawings for this building for KÉSZ Zrt.

Details

Subject of the Contract

HVAC systems design

Location:

Kecskemét, Hungary

Year:

2009-2024

Features

Our colleagues’ advanced German language skills facilitated effective collaboration with the client (project engineer, construction manager). We are equipped with specialized design software that complies with Mercedes’ relevant standards (MicroStation).

Pictures about the Project

More Projects

Location: Budapest, Hungary
Year: 2016
Mechanical engineering design of the entire project, including heating, comfort cooling, and ventilation systems.
Location: Dunaharaszti, Hungary
Year: 2005
Complete building engineering design in the technological and comfort areas.
Location: Budapest, Hungary
Year: 2022
Special mechanical engineering solutions, whose implementation posed significant engineering challenges and required extensive teamwork.

© All rights reserved 2025 Körös-Consult Zrt.