Descrierea proiectului

Our company participated in the building permit process for the Werk1 TGA (MEP) systems and the localization of the construction documents, acting as the Hungarian partner of a German design firm. On behalf of Kraftszer, we prepared the installation drawings for the WERK1 energy center, and as part of the contract, we are providing site engineering services.

In addition, we prepared installation and as-built drawings for several other buildings. During the Werk2 expansion, we developed the detailed construction plans for the new *Rohbau* building on behalf of ATP/MBT, and we also prepared the installation and as-built drawings for this building for KÉSZ Zrt.

Detalii

Obiectul contractului:

HVAC systems design
Locație:
Kecskemét, Hungary
An:
2009-2024

Caracteristici

Our colleagues’ advanced German language skills facilitated effective collaboration with the client (project engineer, construction manager). We are equipped with specialized design software that complies with Mercedes’ relevant standards (MicroStation).

Imagini ale proiectului

Alte proiecte

Locație: Miskolc, Hungary
An: 2014-2015
The airbag manufacturer Takata-Petri built its new factory in Miskolc, and our company was responsible for the design of the entire building technology during the tender phase.
Locație: Dunaharaszti, Hungary
An: 2013
The establishment of the aseptic production line included the design of the mechanical utility systems for sterile product technology.
Locație: Debrecen, Hungary
An: 2016
Following the creation of the detailed designs of Phase I, we designed the complete building engineering systems of Phase II of the factory of FAG.

All rights reserved © 2026 Koros Consult & Engineering SRL