Project Description

Szolnok / Hungary – Kaiser Food Ltd. (2014)

Ensuring a daily water demand of 900 m³ from newly installed wells, treated to drinking water quality – design and implementation.

Környe / Hungary – Bridgestone (2013–2014)

2×25 m³ reverse osmosis units with activated carbon filtration and twin-column water softener, dosing of phosphate, corrosion inhibitor and oxygen scavenger – tender and execution design for various technological demands (steam boilers, cooling towers, water spraying).

Tengiz / Kazakhstan – Tengizchevroil (2010)

Comprehensive building services design: comfort and process ventilation, heating–cooling, drinking water supply, sewerage, gas supply. Water treatment and pipeline design for 2000 m³/day demand of workers’ accommodation.

Budapest / Hungary – Dreher Breweries Ltd. (2010)

Renovation of drinking water wells and design of a 7 km transmission pipeline to ensure 2500 m³/day water demand.

Hungary – Tesco Stores (2009–2010)

Design of water treatment systems for groundwater-based supply serving cooling, irrigation and flushing water needs.

Moscow / Russia – Nidan Canning Factory (2006)

Using existing wells to meet 3000 m³/day industrial, technological and steam supply water demand with complete water treatment.

Details

Subject of the Contract

Water treatment

Location:

Various locations

Year:

2009-

Features

Pictures about the Project

More Projects

Location: Kecskemét, Hungary
Year: 2013
Complete building engineering: comfort ventilation and extraction systems.
Location: Budapest, Hungary
Year: 2016-2021
ETELE Plaza is the newest shopping center in Újbuda. The design of the building began in 2016, construction started in 2018, and it has been in operation since autumn 2021.
Location: Miskolc, Hungary
Year: 2014-2015
The airbag manufacturer Takata-Petri built its new factory in Miskolc, and our company was responsible for the design of the entire building technology during the tender phase.

© All rights reserved 2026 Körös-Consult Zrt.